The first sod is cut as the building of our new school gets under way.

Thursday, 19 March 2009




Ground drainage being formed.








The crane in place ready to lift the final pieces of steel into place.

Mrs Hill on her first vist to the site along with Mr Hamiliton.


















Another high level view.







Looking down over the present P1-P3 playground.


Same view, slightly different angle.


A high level view down into the Foundation Stage classrooms.




John Brown, NEELB Clerk of Works, on the roof between the hall and the main school.


Path to the front of the school being formed.


Plastering begins in the hall.




Looking in throught the reception area of the Primary School.


Looking into the Key Stage 1 Learning Resource Area.


Ex pupil, Emma Wright an architecture student at QUB, viewing the site to aid her with her project on 'planning a school'.

Monday, 9 March 2009







The underfloor heating pipes set in place.







Commencing the floors of the Senior classes.


Another view of this section of the roof.


The roof timbers of the P1&2 classes being put in place.

Wednesday, 4 March 2009


Allison and Anne on site for the first time. They really loved the length of the main corridor!!



Outside doors being fitted.


The corridors get the same treatment.


Polystyrene floors ready for the under floor heating piping.

Drainage pipes on site.

















The dark recesses of the Boiler Room.

The pipe work high in the ceiling of the main corridor.



Looking into the Key Stage Learning Resource Area.


The corridor areas in the Senior school start to take shape.







Slates at last on the Nursery foor.


The crane in position to lift the steel into place.
The steel for the Foundation Stage roof arrives.