The first sod is cut as the building of our new school gets under way.

Thursday, 30 April 2009


Part of the senior corridor.


A P7 classroom really beginning to take shape.



Exterior perimeter fencing being erected.



Tarmac going down in the Senior playground.


The base tarmac on the Senior playground.

Friday, 24 April 2009



The front entrance of the school.

Some playground perimeter fence posts in place.




Internals doors in place in one of the P7 classrooms.

The 'Boss' of the site, Stephen, checking things are all present and correct.

The rain water harvesting tank in place.

The rain water harvesting tank - pretty big!!

The colour of the feature walls in Key Stage 2. Also some of the trunking in place.
The feature wall colour in Key Stage One.

Tuesday, 7 April 2009



Another view of the road.


The road round the back of the Key Stage 2 Playground.


The 'separator' tank.











This photograph shows the curve of the Foundation end of the building.


From a slightly different angle.


The hall floor being formed. There will be a sprung wooden floor on top.


The stone cladding being put round the Front Entrance.


The retaining wall seemed to appear out of nowhere!






























At last the slates start to be put on the Foundation roof.


The clour of the feature wall in the Key Stage 2 classrooms.





Foundation being dug for the retaining wall at the Nursery end of the new school.





Moving equipment so that the ground can be prepared for drainage pipes.


Some of the air ducts etc. attached to the kitchen ceiling.


Preparing the floors in the Reception area for the underfloor heating pipes.